Publications by Philip Burrows


Intra-beam IP feedback studies for the 380 GeV CLIC beam delivery system

IPAC 2016 - Proceedings of the 7th International Particle Accelerator Conference (2016) 2683-2686

RM Bodenstein, PN Burrows, J Snuverink, F Plassard

Copyright © 2016 CC-BY-3.0 and by the respective authors. In its currently-envisaged initial stage, the Compact Linear Collider (CLIC) will collide beams with a 380 GeV center of mass energy. To maintain the luminosity within a few percent of the design value, beam stability at the interaction point (IP) must be controlled at the subnanometer level. To help achieve such control, use of an intra-pulse IP feedback system is planned. With CLIC's very short bunch spacing of 0.5 ns, and nominal pulse duration of 176 ns, this feedback system presents a significant technical challenge. Furthermore, as part of a study to optimize the design of the beam delivery system (BDS), several L∗configurations have been studied. In this paper, we will review the IP feedback simulations for the 380 GeV machine for two L∗configurations, and compare luminosity recovery performance with that of the original L∗configuration in the 3 TeV machine.


Show full publication list